Skip to main content
Advanced Search
Search Terms
Content Type

Exact Matches
Tag Searches
Date Options
Updated after
Updated before
Created after
Created before

Search Results

15 total results found

Doweler Instruction Procedures

Cutout

Powering on Machine 1. Turn switch located on the bottom left. 2. Press “Control Power” button (see image 2) 3. Enter Password "Weeke" 4. Click “Production” 5. Click “Automatic” icon located at...

Lock Miter

Specialty

Purpose To create a seamless joint that is more structurally sound Power on Machine 1. Press “Feed Start” 2. Press “Heads Start”  Miter Part 1. Prep all parts as explained on paperwork 2. Make sure machine table i...

Planer

Specialty

Purpose The purpose for using the planer is to trim boards to a rough thickness consistently throughout the length of the board. Starting the Machine 1. Press the left green button to start lower head (Wait for the gage to reset) ...

Rip Saw Instruction Procedure

Specialty

Purpose To make a straight edge on an unfinished board for a more consistent cut. Power on Machine 1. Press the green button to start the saw blade 2. Press the green button to start link chain conveyor Chain conveyor will not ...

L-Panel Instruction Procedure

Specialty

Purpose The purpose of an L-Panel is to fill the void between the wall and the cabinet.  This will allow for a smoother and much cleaner look. Material Prep 1. Review paperwork for any special instructions that might be needed 2. Gath...

Wide Belt Sander Instruction Procedure

Specialty

Purpose To take a rough board to a fine finish thus shortening hand sanding time Starting Machine 1. Press the left white button Wait for the gage to reset 2. Press the middle white button Wait for the gage to reset ...

Cabinet Inspection

Shipping

Purpose To make sure all imperfection are caught and the cabinet, including any additional parts are properly wrapped and labeled for safe shipping Part Identification 1. Scan product identification label Do not scan any labels unless you're goin...

Parts Inspection Instruction Procedure

Shipping

Purpose To Make sure all imperfections are caught and any additional steps are properly done before wrapping and labeled for safe shipping. Part Identification 1. Go to production coach 2. Type the job name or job number in the search bar located...

Upcut Saw Instruction Procedure

Drawer Box

Purpose Using the Upcut saw will provide you with digital accuracy and a cleaner and smoother cut Powering on Machine 1. Turn on the control panel by pressing the red switch located on the right side of the blue electrical box behind the control p...

Lock Dowel Drawer Box Instruction Procedure

Drawer Box

Purpose Lock dowels are used to create a clean non fastener look for melamine boxes Drawer Box Assembly 1. Gather all your parts by reading the labels Labels will be coordinated with a number in the top right corner with Left, Right, Front, Back,...

Dovetail Jointer Instruction Procedure

Drawer Box

Purpose Dovetail joints make the drawer box stronger while still giving it a classier look Powering Up Machine 1. Turn the switch to the on position, located on the right side of the machine 2. Press the white button on the left...

CNC Instruction Procedure

Cutout

Starting and Resurfacing The CNC table should be resurfaced at the beginning of each shift. 1. To start the machine simply turn the switch to the on position  2. Click the "F11" icon located at the bottom right of the screen  ...

Warning Center

Production Coach

1- Go to the station configuration  2- First, select the station you want the alerts to be seen at (1) then click on the eye (2)  3- Select "Show Warning Center, "Damaged Notifications, "Activate Blinking Icon on unread Notifications", click Save  4- The Warni...

Remove Items from Bins

Production Coach

1- Click in the select bin icon then on the bin you wish to clear:  2- Then click on "See parts inside"   3- Click on the "X"  

Database Sync

Production Coach

1. Click the Green icon located in the top left corner, click Configuration and then Local Options 2. Click the barrel in the System Database area located in the top left 3. Enter Password and click the green check mark  ( password: WebCabsync123!!) ...