Shipping
Cabinet Inspection
Purpose
To make sure all imperfection are caught and the cabinet, including any additional parts are properly wrapped and labeled for safe shipping
Part Identification
|
1. Scan product identification label Do not scan any labels unless you're going to finish the inspection |
![]() |
| 2. Using the part number on the label to verify the right part was scanned | ![]() |
|
3. Click the "Product" icon located on the lower right side of the screen This step will print a finished product label to be applied to the part when inspection is completed |
![]() |
Part Verification
|
1. Click the "Green Clipboard" icon This will bring up a list of all the parts for the room on the left side of the screen |
![]() |
|
2. On the left side of the screen select the part your inspecting This will bring up the parts spec sheet |
![]() |
4. Measure the width, height, and depth of the part being inspected
5. Verify all special instructions are complete and correct.
Part Inspection
1. Inspect all finished surfaces for any imperfections
If imperfections are found inform your supervisor before continuing
2. Inspect all drawers, drawer banks, and drawer fronts for imperfections
If imperfections are found inform your supervisor before continuing
3. Inspect edge band for imperfections and remove any remaining glue left by the edge bander.
4. If the special instructions call out for fixed shelves, adjustable shelves, and/or addons make sure they are inspected for any imperfections as well.
If imperfections are found inform your supervisor before continuing
5. If tall adjustable shelves are needed for the cabinet, make sure they are wrapped separately according to the proper color and labeled correctly
Part Shipping Prep
|
1. Use both cardboard and foam |
![]() |
|
2. Cover all finished services that will be seen after installation |
|
|
3. Refer to the white board to verify color the part will be wrapped in |
![]() |
|
4. Wrap part in coordinated color |
![]() |
|
5. Scan finished label This will change the status of the part to wrapped |
![]() |
Parts Inspection Instruction Procedure
Purpose
To Make sure all imperfections are caught and any additional steps are properly done before wrapping and labeled for safe shipping.
Part Identification
1. Go to production coach
|
2. Type the job name or job number in the search bar located in the top left corner |
![]() |
|
3. On the left side of the screen click on the room the part is for |
![]() |
|
4. Click on the green clipboard located on the right side of the screen |
![]() |
|
5. On the left side of the screen click on the part you are inspecting |
![]() |
6. Using the part number on the label to verify the right part was looked up
Often there are parts that are labeled incorrectly or not labeled. If you come across this, stop and get your supervisor, they will walk you through the additional steps
Part Verification
2. Measure the width, height, and depth of the part being inspected
3. Verify all special instructions are complete and correct
Part Inspection
1. Inspect all finished surfaces for any imperfections
If imperfections are found inform your supervisor or the department it was made in before continuing
2. Inspect edge band for imperfections, including chips around the edge band and remove any remaining glue let by the edge bander
|
3. When the inspection is complete go back to the main screen and click on the part that was inspected |
![]() |
4. Status check the part as "Checked" to ensure others that the part has been inspected
|
5. Click the "Product" icon located on the lower right side of the screen This step will print a finished product label to be applied when inspection is completed |
![]() |
Part Shipping Prep
|
1. Wrap the part in foam |
![]() |
2. Use edge protectors on all finished edges or edges that are 1.5 inches or bigger
3. Check finished label and refer to the white board to verify color the part will be wrapped in
|
4. Wrap part in coordinated color |
![]() |
5. Attach finished label to the part and place tape over the label to prevent it from falling off
6. Scan finished label
This will change the status of the part to wrapped



















